Resources
Deliverables
D3.5. ESS 2 KESS Kinetic Energy Storage System (Flywheel) for marine applications. Summary of the results achieved
D4.5 EESS Electric Energy Storage System (Supercapacitors) for marine applications. Summary of results
The EESS is a supercapacitor-based energy storage system designed for peak-shaving applications in hybrid marine electrical systems, particularly for ferry applications requiring high dynamic response and short-duration high-power support.
D6.1 Regulation: State of the art and gaps
One alternative to the conventional mechanical propulsion arrangement is an electric propulsion system, which allows for the propulsion requirements of the vessel to be provided by an electric distribution system, driving electric propulsion motors or thrusters and optimizing its efficiency by means of Energy Storage Systems. Hybrid and all-electric power systems offer the opportunity to improve safety, reliability, operational efficiency, fuel consumption, and environmental footprint. They may extend the equipment maintenance intervals when compared to conventional mechanical power systems, supporting therefore Autonomous operations.
D6.2 HAZID study
A HAZID (Hazard Identification) is essential for the POSEIDON project to ensure the safetyand regulatory compliance of the innovative ESS. The HAZID process helps identify potential hazards early in the project lifecycle, allowing for timely corrective actions and comprehensive risk management. This is crucial for addressing safety concerns, regulatory requirements, and long-term risks associated with the deployment of these advanced energy storage systems in maritime settings.
D6.3 Risk assessment
The POSEIDON project aims to demonstrate the applicability of three innovative fast-response energy storage systems (ESS) for waterborne transport: supercapacitors, flywheels, and magnetic energy storage systems. The project focuses on their integration onboard ships to improve safety, energy efficiency, and cost competitiveness in maritime operations.
A risk assessment is essential to ensure the safety and regulatory compliance of these innovative ESS.
D8.1. POSEIDON dissemination, communication and exploitation plan
D8.2. 1st Updated report on dissemination and communication activities
D8.3 2nd Updated report on dissemination and communication activities
This second updated report D8.3 builds upon the activities described in Deliverable D8.2 and
includes all communication and dissemination actions implemented between Month 19 and Month 36 of the POSEIDON project (July 2024 – June 2025).
D8.6. POSEIDON website operational
What’s next?
Stay tuned.
Publications
[Comming soon]
Dissemination Materials
[Comming soon]
Newsletters
[Comming soon]